← 石油英语 · 现场常用语

井控应急现场英语

现场常用语 · 井控应急 · 共 121 句

井控是钻井作业中容错率最低的环节,从发现溢流到关井通常只有几十秒,沟通必须一次到位。本页收录井控应急场景的现场英语,覆盖溢流征兆识别与报告、关井程序、立压套压读取、司钻法与工程师法压井、节流管汇操作与应急撤离,中英对照可直接照读。

下面 121 句按现场使用频率整理,中英对照可直接照读;需要跟读发音、收藏生词或做场景练习时,可用配套 App。

📗 打开石油英语

井控应急常用句(121 句)

立即关井。Shut in the well now.
硬关井,快关防喷器。Hard shut-in, close the BOP fast.
先关节流阀,再关防喷器。Soft shut-in: close the choke first, then the BOP.
司钻发现溢流就关井。Driller shuts in on any flow indication.
停泵,看井是否外溢。Shut down the pumps and check the well for flow.
井在溢流,井口有外溢。The well is flowing at surface.
泥浆池液面在涨。Pit level is rising.
返出比泵入多。We're getting more returns than we're pumping.
这是井涌信号。That's a kick indicator.
确认是真溢流,不是假象。Confirm it's a real kick, not a false alarm.
钻速突然加快。We've got a drilling break.
钻时变快,可能进高压层。Faster ROP, we may be in a higher-pressure zone.
起钻时灌不进泥浆。The hole won't take its fill on the trip out.
井没吃够泥浆。The hole is not taking the proper fill.
接立柱前先做流动检查。Run a flow check before making the connection.
做个流动检查。Do a flow check.
关井,流动检查阳性。Shut in, the flow check is positive.
气侵了,泥浆密度在降。We've got gas cut mud, mud weight is dropping.
返出泥浆含气。The returns are gas cut.
后效气上来了。The connection gas is coming up.
循环钻井液除气。Circulate the gas out through the degasser.
启动除气器。Line up the mud-gas separator.
气体到节流管汇了,小心。Gas is hitting the choke manifold, watch it.
环形防喷器关到位了吗?Is the annular preventer fully closed?
关环形防喷器。Close the annular preventer.
关上闸板防喷器。Close the pipe rams.
关全封闸板。Close the blind rams.
井里没管,关剪切闸板。No pipe in the hole, close the blind shear rams.
剪断钻杆,关剪切闸板。Shear the pipe and close the shear rams.
防喷器关井压力是多少?What's the closing pressure on the BOP?
蓄能器压力够不够关井?Is the accumulator pressure enough to close in?
检查蓄能器组压力。Check the accumulator pressure.
关防喷器前先打开液压闸阀。Open the hydraulic gate valve before closing the BOP.
环空封了,记录压力。Annulus is sealed, record the pressures.
记录关井立管压力。Record the shut-in drill pipe pressure.
记录关井套管压力。Record the shut-in casing pressure.
等压力稳定再读数。Let the pressures stabilize before you read them.
关井立压是多少 psi?What's the shut-in drill pipe pressure in psi?
套压比立压高。Casing pressure is higher than drill pipe pressure.
套压升到 800 psi 了。Casing pressure has climbed to 800 psi.
立压稳定在 500 psi。Drill pipe pressure is steady at 500 psi.
溢流量大约 10 桶。We took about a 10 bbl kick.
量一下溢流进了多少桶。Measure how many barrels we gained in the pits.
溢流进尺记好。Log the pit gain.
算地层压力。Calculate the formation pressure.
算压井泥浆密度。Calculate the kill mud weight.
压井液密度要加到 12.5 ppg。We need to raise the kill mud weight to 12.5 ppg.
把泥浆密度调到 1.45 sg。Bring the mud weight up to 1.45 sg.
加重泥浆,准备压井。Weight up the mud to kill the well.
压井液配好了吗?Is the kill mud ready?
我们用司钻法压井。We'll kill the well with the driller's method.
第一循环用原浆顶出溢流。First circulation pumps the influx out with original mud.
第二循环泵入压井液。Second circulation pumps the kill mud.
改用工程师法,一次循环压井。Switch to the wait-and-weight method, kill in one circulation.
工程师法要先配好压井液。Wait and weight needs the kill mud weighted up first.
算低泵速循环压耗。Calculate the kill rate circulating pressure.
用慢循环速率压井。Circulate at the slow pump rate to kill the well.
记录低泵冲循环压力。Record the slow circulating rate pressure.
低泵速读数,30 冲每分。Take a slow pump rate reading at 30 SPM.
按 ICP 起泵。Bring the pump up to the initial circulating pressure.
保持立压不变,调节流阀。Hold drill pipe pressure constant with the choke.
用节流阀控制立压。Control the drill pipe pressure with the choke.
立压偏高,稍开节流阀。Drill pipe pressure is high, open the choke a touch.
立压掉了,关小节流阀。Drill pipe pressure dropped, close in on the choke.
按压井单走立压。Follow the drill pipe pressure schedule on the kill sheet.
压井单画好了吗?Is the kill sheet filled out?
压井液到钻头,降到 FCP。Kill mud at the bit, drop to final circulating pressure.
FCP 是 420 psi。Final circulating pressure is 420 psi.
压井液出钻头,看套压降。Kill mud out the bit, watch casing pressure drop.
全程保持泵速恒定。Keep the pump rate constant throughout.
别让泵速变。Don't let the pump rate change.
压井液返到地面了。Kill mud is back at surface.
停泵,做流动检查。Shut down and do a flow check.
立压套压都归零。Both drill pipe and casing pressures are zero.
井压住了。The well is dead.
再循环一周确认压稳。Circulate bottoms up to confirm the well is dead.
全井都是压井液。The whole hole is full of kill mud.
打开防喷器,恢复钻进。Open the BOP and resume drilling.
节流管汇有刺漏。We've got a washout on the choke manifold.
切换到备用节流阀。Switch over to the backup choke.
用远程节流阀控制。Control with the remote choke.
节流管汇压力表跳得厉害。The choke manifold gauge is bouncing badly.
节流循环时盯紧压力。Watch the pressures closely while choking back.
节流阀堵了,马上换线。The choke is plugged, switch lines now.
打开放喷管线。Open the flare line.
点火放喷。Light the flare.
井喷了!所有人撤离!Blowout! Everybody clear the floor!
井喷失控,启动应急预案。The well is out of control, go to the emergency plan.
立即通知甲方代表。Notify the company man immediately.
叫井队队长上钻台。Get the toolpusher to the rig floor.
打电话给井控工程师。Call the well control engineer.
通知钻井监督。Inform the drilling supervisor.
上报井涌给作业方。Report the kick to the operator.
拉响溢流警报。Sound the kick alarm.
按下硫化氢报警。Hit the H2S alarm.
检测到硫化氢,戴上空气呼吸器。H2S detected, put on your SCBA.
全员到集合点。All hands to the muster point.
清点人数。Do a head count.
开个井控前安全会。Hold a pre-job well control safety meeting.
今天做防喷演习。We'll run a BOP drill today.
司钻演习,关井计时。Driller's drill, time the shut-in.
起钻演习,看反应。Trip drill, let's see the response time.
关井用了多少秒?How many seconds to shut in?
演习记录归档。Log the drill in the records.
每班测试防喷器。Function test the BOP every tour.
试压防喷器到 5000 psi。Pressure test the BOP to 5000 psi.
防喷器试压合格。BOP test passed.
检查内防喷工具在不在钻台。Check the inside BOP is on the floor.
钻台备好旋塞阀。Have the kelly cock ready on the floor.
装上回压凡尔。Stab the float valve.
起钻前坐好顶驱旋塞。Close the upper kelly cock before tripping.
起钻保持灌满井眼。Keep the hole full while tripping out.
用灌浆罐计量。Use the trip tank to monitor the hole.
对照起下钻量表。Check against the trip sheet.
溢流没控制前别起钻。Don't trip until the kick is under control.
井不稳就装回压凡尔。Stab the float if the well's still active.
持续监控立套压。Keep monitoring drill pipe and casing pressures.
地层破裂了,套压不再涨。We may have broken down the formation, casing pressure stopped rising.
考虑反循环压井。Consider a reverse circulation kill.
准备体积法控压。Get ready to use the volumetric method.
按体积法放压。Bleed off by the volumetric method.

使用要点