← 石油英语 · 现场常用语

交接班现场英语

现场常用语 · 交接班 · 共 114 句

交接班是把一个班次的井下状况、设备状态与未完事项完整传给下一班的过程,信息一旦遗漏,接班人就是在盲区里作业。本页收录交接班场景的现场英语,覆盖当班工况汇报、井下异常说明、设备状态与遗留问题移交、下一班注意事项,中英对照可直接照读。

下面 114 句按现场使用频率整理,中英对照可直接照读;需要跟读发音、收藏生词或做场景练习时,可用配套 App。

📗 打开石油英语

交接班常用句(114 句)

当前钻头深度 3,240 米。Current bit depth is 3,240 metres.
井深 3,255 米,钻进中。Hole depth is 3,255 metres, still drilling ahead.
钻头离井底还有 15 米。Bit is 15 metres off bottom.
现在正在井底钻进。We're on bottom drilling now.
刚钻完一柱,准备接单根。Just finished a stand, about to make a connection.
套管下到 2,800 米。Casing is set at 2,800 metres.
上次完井深度 3,100 米。Last casing shoe is at 3,100 metres.
泵压稳定在 180 巴。Pump pressure is steady at 180 bar.
泵压突然掉了 20 巴。Pump pressure dropped 20 bar all of a sudden.
立管压力 2,600 psi。Standpipe pressure is 2,600 psi.
排量 3,200 升每分。Flow rate is 3,200 litres per minute.
现在两台泵在跑,每分钟 95 冲。Two pumps are running at 95 strokes per minute.
一号泵上线,二号泵备用。Number one pump is online, number two is on standby.
泵冲调到 110。Bring the pump up to 110 strokes.
钻压保持在 12 吨。Keep weight on bit at 12 tonnes.
钻压 25 klbs,转速 80 转。WOB is 25 klbs at 80 RPM.
转盘转速 120 RPM。Rotary speed is 120 RPM.
现在用顶驱钻进,转速 90。Drilling on the top drive at 90 RPM.
机械钻速大概 8 米每小时。ROP is running about 8 metres per hour.
这一段钻速明显变慢。ROP has slowed down noticeably through this section.
扭矩偏高,注意憋钻。Torque is running high, watch for stalling.
扭矩在 18 千牛米左右。Torque is around 18 kN·m.
泥浆密度 1.25 sg。Mud weight is 1.25 sg.
泥浆比重 10.4 ppg。Mud weight is 10.4 ppg.
漏斗粘度 45 秒。Funnel viscosity is 45 seconds.
失水量控制在 6 毫升。Fluid loss is held at 6 mL.
泥浆 pH 值 9.5。Mud pH is 9.5.
含砂量偏高,需要除砂。Sand content is high, we need to run the desander.
出口密度比进口高 0.02。Flowline mud weight is 0.02 higher than the suction.
循环罐液面正常。Pit levels are normal.
刚补了 30 桶新浆。Just added 30 bbl of fresh mud.
重晶石快用完了,需要补料。We're running low on barite, need to restock.
固控设备运转正常。Solids control equipment is running fine.
振动筛筛布该换了。The shaker screens need changing.
绞车刹车有点发热。The drawworks brake is running a bit hot.
顶驱运行正常,无异响。Top drive is running smooth, no odd noises.
柴油机三号在检修。Number three engine is down for maintenance.
发电机负载稳定。Generator load is stable.
防喷器组测试合格。The BOP stack tested good.
环形防喷器昨天试压通过。The annular preventer passed its pressure test yesterday.
节流管汇阀门已检查。Choke manifold valves have been checked.
井口压力为零。Wellhead pressure is zero.
上一班把井打到 3,200 米。The previous shift drilled the well to 3,200 metres.
上班接了 12 个单根。They made twelve connections last shift.
上一班没有异常情况。There were no abnormalities on the previous shift.
上班划眼到底,无遇阻。They reamed to bottom last shift with no tight spots.
上一班换了一个钻头。The previous shift changed out a bit.
上班做了一次短程起下钻。They did a short trip last shift.
上班的循环没做完,留给我们。The circulation wasn't finished, they left it for us.
遗留问题:二号泵密封漏。Leftover issue: number two pump has a leaking seal.
还有一柱钻杆没甩出去。There's still one stand of pipe to lay down.
待办:下午要下测井仪。To do: we're running logging tools this afternoon.
注意:3,180 米有缩径。Heads up: there's a tight hole at 3,180 metres.
注意井底有掉块。Watch out for cavings on bottom.
过 2,950 米要慢点起钻。Pull slow through 2,950 metres.
这口井容易井漏,盯紧液面。This well tends to lose returns, keep an eye on the pits.
现在全力循环洗井。We're circulating to clean the hole right now.
循环一周需要 90 分钟。Bottoms-up takes about 90 minutes.
等返出口干净再起钻。Wait for clean returns before we trip.
现在正在起钻。We're tripping out of the hole now.
起钻到 1,500 米。We've pulled up to 1,500 metres.
现在下钻,速度正常。Tripping in the hole at a normal speed.
下钻遇阻在 2,400 米。Hit resistance going in at 2,400 metres.
灌满钻杆再继续下。Fill the pipe up before you go any further.
起钻每三柱灌一次浆。Fill the hole every three stands while pulling out.
接好方钻杆,准备开泵。Pick up the kelly and get ready to break circulation.
现在坐卡瓦,准备卸扣。Setting the slips now, about to break out.
井架工已就位。The derrickman is in position.
司钻交班记录已签字。The driller's tour report is signed.
队上一共 18 个人。There are eighteen men on the crew.
白班司钻是老王。Wang is the day-shift driller.
甲方代表在现场。The company man is on site.
钻井监督已通知。The toolpusher has been notified.
泥浆工正在测性能。The mud engineer is running tests now.
新来的钻工还在培训。The new floorhand is still under training.
钻杆库存还有 40 根。We've got forty joints of drill pipe in stock.
水泥车明天到。The cement truck arrives tomorrow.
柴油储量够用两天。We've got enough diesel for two days.
钻头到货了,放在工具房。The new bit has arrived, it's in the tool house.
故障记录:刹车刹把磨损。Fault log: the brake lever is worn.
昨晚顿钻一次,已解卡。We had a stuck-pipe scare last night, it's freed now.
绞车昨天跳了一次电。The drawworks tripped out once yesterday.
液压站压力不稳,已上报。The hydraulic unit pressure is unstable, it's been reported.
气路有泄漏,正在排查。There's an air leak we're tracking down.
上次井涌已压井成功。The last kick was killed successfully.
井下没有复杂情况。There are no downhole problems.
地面管线试压合格。Surface lines passed the pressure test.
下一步钻到 3,400 米下套管。Next we drill to 3,400 metres and run casing.
计划今晚完钻。We plan to reach TD tonight.
钻完这趟就起钻换钻头。After this run we'll trip out to change the bit.
接下来要做地层测试。Next up is a formation test.
准备做一次随钻测井。We're getting ready to run an MWD survey.
下步要循环加重泥浆。Next we'll circulate and weight up the mud.
计划把密度提到 1.30。The plan is to raise mud weight to 1.30 sg.
明早九点开钻前会。There's a pre-spud meeting at nine tomorrow.
如果井漏就立刻停泵汇报。If we lose returns, stop the pumps and report at once.
发现溢流马上关井。Shut in the well the moment you see a flow.
关井压力要记下来。Record the shut-in pressures.
立压和套压都要监控。Monitor both the drillpipe and casing pressures.
压井液已备好,密度 1.35。Kill mud is ready at 1.35 sg.
逃生路线和集合点清楚吗?Are the escape routes and muster point clear?
硫化氢监测仪正常吗?Are the H2S monitors working?
高处作业必须系好安全带。Wear your harness for any work at height.
今天有动火作业,办了票。There's hot work today, the permit is signed.
上次班组没有受伤报告。There were no injuries reported last shift.
井队物资交接清单已核对。The materials handover list has been checked.
交班前把工具归位。Put the tools back before handover.
钻台清理干净再交班。Clean up the rig floor before you hand over.
防喷演习这周还没做。We haven't run the BOP drill this week yet.
天气预报有大风,注意起重作业。High winds are forecast, take care with any lifting.
还有什么要交代的吗?Anything else I should know?
有问题随时打电话给我。Call me anytime if there's a problem.
交接班记录我已经看过了。I've gone through the tour report.
一切正常,可以接班了。All good, I'm ready to take over.

使用要点